HOCO B2B
Ways of working

Rituals and communication

The weekly rhythm with agendas, the channels and what each is for, response times, meeting notes, progress reporting, the escalation path and the Ramadan schedule.

Working hours and language

  • Sunday to Thursday. Normal day 09:00–17:00, core hours 10:00–15:00 when everyone is reachable. Times are Africa/Algiers.
  • Friday and Saturday carry no expectation, except the on-call duty of the pilot (on-call).
  • Absences are announced at least a week ahead when planned, or by 09:00 the same day otherwise. Anis records them in people[].unavailable in tasks.json and the plan recomputes.
  • Language. French with HOCO: e-mails, recaps, release notes, change requests, validation documents. English in code, commits, PRs, issues and these docs. The product's UI copy is French.

Weekly rhythm

WhenRitualLengthWhoOutput
Sunday 10:00Planning30 minTeamOne line per person in the team group: the week's task ids
Monday–Thursday, by 10:00Stand-up messageAsyncEach personYesterday / today / blockers
Wednesday 14:00Mid-week sync20 minTeamBlockers cleared, changes announced, demo list
Thursday 11:00Internal demo45 minTeamDone tasks shown and recorded
Thursday, by 12:00Thursday reportAsyncEach personDone / in progress / blocked, with task ids and PRs
Thursday, by 16:00Progress update—Anistasks.json statuses and the Progress page
Every second Thursday 14:00Client review60 minTeam + HOCORecap e-mail within 24 h; decisions into the register
Every second Thursday 15:15Retro30 minTeamAt most 3 actions with owners
Design days, 15:30Feasibility check15 minAkram + the platform's developerReady for dev frames
Acceptance and pilot, every day 16:30Triage call15 minTeam (+ HOCO's pilot lead during the pilot)Severity, owner and fix version of new issues

Assumption — the client review slot (every second Thursday at 14:00) is confirmed with HOCO at the cadrage workshop (PRJ-03).

Sunday planning

  1. Last week against the plan: what slipped and why (5 min).
  2. This week per person, from the week-by-week plan (10 min).
  3. Dependencies: contract changes coming, designs to hand off, decisions due (register) (10 min).
  4. What HOCO must provide this week — data, access, answers (5 min).

Sunday has no stand-up message: the planning replaces it.

Daily stand-up message

Posted in the team group by 10:00, Monday to Thursday. Task ids are mandatory; a blocker names who or what it waits for.

Stand-up — Imad
Yesterday: MRA-04 cart screen against the mock (PR #31 open)
Today: MRA-04 checkout confirmation; review hoco#52 (contract)
Blockers: cart.checkout example lacks the CREDIT_LIMIT_EXCEEDED error — Anis

Nobody answers a stand-up in the group. A blocker is handled directly with the person named, within the hour.

Mid-week sync

  1. Blockers older than half a day.
  2. Contract changes and design changes coming before Sunday.
  3. Open Critical and Major issues, needs-info issues older than 3 days.
  4. Walkthrough of PRs labelled security merged this week (5 min).
  5. What each person will show on Thursday.

Thursday internal demo

  • Show, do not tell: from staging (or Claude Design for design), never from localhost.
  • For each item: task id, what is done, what is left.
  • Each done item has its recording of at most 2 minutes attached to the PR (definition of done).
  • Akram notes design-QA findings; Anis notes what changes in the plan.

Client review

HOCO receives the agenda at least one working day before. Anis chairs.

  1. Progress against the milestones — the Progress page (5 min).
  2. Demo of what is new (30 min), driven by the team on staging, or by HOCO's testers on pre-production when a candidate is out.
  3. Decisions due — the register items whose needed-by task is near (15 min).
  4. Change requests: new, analysed, waiting for a decision (5 min).
  5. The next two weeks (5 min).

Nobody accepts new scope during the review: the answer is « C'est noté — nous revenons vers vous avec l'impact » and a change request follows. Anis sends the recap e-mail within 24 hours (template).

Retro

Keep / stop / try, 30 minutes. At most three actions, each with an owner and a deadline expressed as a task id or "before the next retro". Actions are reviewed at the next retro. An action that changes a rule becomes a PR to these pages.

Channels

NeedChannelRule
Quick questions, coordination, stand-upsWhatsApp group "HOCO — équipe" (Anis, Imad, Akram)Self-contained messages with task ids; nothing decided there stays only there
Day-to-day exchanges with HOCOWhatsApp group "HOCO — projet" (HOCO's project lead + the team)Anis answers anything about scope, dates and cost; Imad and Akram answer factual questions only
Formal exchanges: validations, PV, change-request decisions, plan changesE-mail between Anis and HOCO's project lead (sponsor in copy for decisions)The written record HOCO answers or signs
Bugs, task follow-upGitHub issues in the right repositoryA bug seen in a chat is copied into an issue the same day
Code discussionGitHub PRsReview comments, not chat
Design feedbackComments on the shared design, on the frame (or on the GitHub issue)Resolved when addressed
DecisionsThe decision registerWritten within one working day of the call or meeting
Plan, specs, how-tosThis siteChanged by PR
CallsGoogle Meet, from the calendar invitationsNotes required for every client call
Meeting notesGitHub Discussions, category Meetings, in hoco; for client meetings also the recap e-mailTemplate
SecretsThe password managerNever anywhere else

Never decide in chat only. A decision reached in WhatsApp or in a call exists only once it is in the register (or, for a technical choice, in an ADR on the architecture page).

Response times

Working hours, Sunday to Thursday.

EventExpected within
A question in the team group2 working hours
A message starting with BLOCKED1 working hour
First review of a PR1 working day; contract PRs and hotfixes 4 working hours (PR rules)
A message from HOCOAcknowledged by Anis the same working day; answered within 2 working days, or logged in the register with its needed-by task
A request from the team to HOCO (decision, data, access)Sent with the task it blocks; chased at the next client review
A production incidentResponse targets

Outside working hours nobody is expected to answer; muting notifications is fine. A phone call is reserved for P1 incidents.

Meeting notes

The person who called the meeting writes the notes (Anis for every client meeting) and publishes them within 24 hours.

# <Réunion / Meeting> — YYYY-MM-DD
Participants:
Ordre du jour / Agenda:

## Décisions / Decisions
- D-xx — <decision> (entered in the register)

## Actions
- <who> — <what> — <task or issue id> — <by when: task or next meeting>

## Questions ouvertes / Open questions
- <question> → register D-xx, owner, needed by <task id>

## Notes

For client meetings the same content, in French, goes to HOCO by e-mail, which is the record HOCO can answer.

Progress reporting

  1. Thursday by 12:00 each person posts their Thursday report: done (task ids and PRs), in progress (what remains), blocked (on what — a decision, a dependency, a person).
  2. Thursday by 16:00 Anis sets status: "done" and doneOn in tasks.json, runs pnpm docs:generate, adds the dated section to the Progress page (what was delivered, with PR links; what changed in the plan and why), and merges a docs(plan): … PR. The docs deploy publishes it.
  3. tasks.json records only done work: "in progress" lives in PRs and stand-ups. A slip is never fixed by editing a date — it is a changed effort, dependency or scope (planning method).
  4. HOCO follows progress through the Progress page, the client review and the recap e-mail.

Escalation

SituationWho actsHow
Blocked by a teammateThe blocked personBLOCKED message with the task id; answer within 1 working hour
Blocked for more than half a working dayAnisRe-orders the lane, switches to the mock, applies the decision's default, or pairs for an hour
Blocked on HOCO (decision, data, access)AnisRegister entry with owner, default and needed-by task; raised at the next client review; if the needed-by task starts within 5 working days, a direct call and e-mail to HOCO's project lead
HOCO rejects the default and does not decideAnisE-mail to HOCO's sponsor with the impact computed by the scheduler (which milestone moves, by how much)
A milestone is at riskAnisWritten notice to HOCO with the new computed date and the options of If dates slip

Ramadan

Ramadan is expected from about 8 February to 8 March 2027, Eid al-Fitr around 9–10 March (both confirmed on announcement; the Eid days are holidays in the plan). The plan keeps the working days; the schedule changes:

ItemNormalDuring Ramadan
Working day09:00–17:00, core 10:00–15:0009:00–15:00, core 10:00–14:00
Stand-up messageBy 10:00By 10:30
MeetingsAny time in core hoursBetween 10:00 and 13:00 only
Thursday demo, client review, retro11:00, 14:00, 15:1510:30, 11:30 (client review), 12:45 (retro)
Production deploy window09:00–14:0009:00–13:00
Planned maintenanceAfter 20:00None
Pilot on-call hours08:00–19:00Follow the field hours HOCO announces; no expectation from sunset to 90 minutes after

The pilot may overlap Ramadan: its KPIs are read in that context, or HOCO chooses to start it after Eid — see the timeline.