MDA-06 — Delegate app — visit report & follow-ups

Structured report with chips/multi-selects, next action and follow-up date, attachments; follow-ups list with complete/reschedule.

FieldDetails
Task codeMDA-06
PhaseP1 — V1 build & integration
Product scopeV1
StatusPlanned
StartSun 6 Dec 2026
DueMon 7 Dec 2026
ResponsibleImad — Mobile developer (Flutter)
Co-responsible—
Effort1.25 person-day(s) planned · 4 from scratch · size S
Area · appDelegate app · mobile
Depends onDES-13
Unblocks—
Milestones—

Summary

Structured report with chips/multi-selects, next action and follow-up date, attachments; follow-ups list with complete/reschedule.

Description

The structured visit report is what turns a visit into a follow-up: person met, interest, products and promotions presented, issues, next action and follow-up date (FLD-10), and the next action becomes a task the delegate must act on (CRM-08). Scope: visit report DA-12 with chips and multi-selects, attachments, and the follow-ups and tasks list DA-19 (due today, overdue, upcoming) with complete and reschedule. The report is saved through the outbox with delegate.visits.report; a provisional local task is created so DA-19 shows the follow-up before sync. It needs SRV-21/SRV-14 (report schema, task creation rule, delegate.tasks.*), the reference lists PERSON_ROLE and VISIT_ISSUE_TAG, and Akram's DES-13 frames. MDA-05's end-of-visit check depends on the report being saved when the visit type requires it.

Subtasks

#SubtaskOwner
1VisitReportScreen DA-12: person met (PERSON_ROLE), interest level chips « Faible » / « Moyen » / « Élevé », products and promotions presented (multi-select from cached categories, brands and active promotions), issue tags (VISIT_ISSUE_TAG), commentImad
2Next action selector (« Relance téléphonique », « Nouvelle visite », « Envoyer le catalogue », « Message WhatsApp », « Aucune ») with a follow-up date required unless « Aucune »Imad
3Report attachments (photos via MOB-11) and draft autosave in driftImad
4Save with PUT /delegate/visits/{id}/report through the outbox (client report id, occurredAt); report edits allowed until the visit locksImad
5Provisional local CrmTask row from the next action, replaced by the server task on delta pullImad
6FollowUpsScreen DA-19 on GET /delegate/tasks: sections « Aujourd'hui », « En retard », « À venir », TaskType labels, link to the point-of-sale sheetImad
7Complete with outcome (POST /delegate/tasks/{id}/complete) and reschedule or annotate (PATCH /delegate/tasks/{id}) through the outboxImad
8Due-task reminders: push from the server (CRM-08) opening /tasks, badge on the home quick actionImad

Deliverables

  • apps/delegate/lib/src/features/report/ (DA-12)
  • apps/delegate/lib/src/features/followups/ (DA-19)
  • Outbox mutation types delegate.visits.report, delegate.tasks.complete, delegate.tasks.update

Acceptance criteria

  • A report cannot be saved with a next action other than « Aucune » and no follow-up date (FLD-10)
  • Saving a report offline immediately shows the follow-up in DA-19; after sync the server task replaces it without duplication (CRM-08)
  • Overdue tasks appear in « En retard » based on the Africa/Algiers date
  • Completing or rescheduling a task works offline and syncs once
  • A report drafted and left unsaved is restored when the delegate returns to it

Requirements covered

RequirementTitleRelease
FLD-10Structured visit report (person met, interest, products and promotions presented, issues, next action, follow-up date, attachments) that triggers the follow-upV1
CRM-08Follow-ups (relances), tasks and next actions with due dates and notificationsV1

Screens

ScreenNameApp
DA-12Visit reportDA
DA-19Follow-ups & tasksDA

API surface

Test measures

  • Widget tests of report validation rules (next action ↔ date, required fields)
  • Unit test of provisional task replacement on delta pull
  • Integration test: visit → report offline → reconnect → task visible in the back-office

Risks

  • Report fields may evolve with HOCO's field managers — render options from reference lists, not hard-coded enums, where the spec allows it

KPI

  • Delivered by Mon 7 Dec 2026 within 1.25 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.