DES-13 — Day 13 — Delegate app: visit, report, prospects, follow-ups

Visit and check-in, not-done reason, visit report, prospects list/map, follow-ups.

FieldDetails
Task codeDES-13
PhaseP0 — Foundations (cadrage, UX/UI, architecture & contract)
Product scopeV1
StatusPlanned
StartWed 4 Nov 2026
DueWed 4 Nov 2026
ResponsibleAkram — UI/UX designer
Co-responsible—
Effort1 person-day(s) planned · 1.25 from scratch · size S
Area · appDelegate app design · design
Depends onDES-12
UnblocksMDA-04, MDA-05, MDA-06, DES-14
Milestones—

Summary

Visit and check-in, not-done reason, visit report, prospects list/map, follow-ups.

Description

Day 13 designs a full visit that works offline and ends with a structured report that creates the follow-up. The screens are DA-10 visit and check-in, DA-11 visit not done, DA-12 visit report, DA-13 prospects and resellers (list/map) and DA-19 follow-ups. Inputs: the delegate-05-visit-checkin and delegate-09-visit-report references, the Day-5 visit-flow wireframe, cahier §6.4 and §6.8, FLD-08/09/10, CRM-04/08, ACL-03, GEO-03, and the operations delegate.visits.*, delegate.resellers.list, delegate.tasks.* and reference.lists. One correction to the reference: « Terminer la visite » is a normal completion and uses primary, not red. Consumers: Imad's MDA-04 (DA-13), MDA-05 (DA-10, DA-11) and MDA-06 (DA-12, DA-19).

Subtasks

#SubtaskOwner
1DA-10 Détail de la visite, one primary action per VisitStatus: À visiter (arrive), Arrivé (« Commencer la visite », arrival time), En cours (live duration, checklist 0/5, quick note 0/300, photos, call, « Terminer la visite » in primary), Visité (read-only with lock note VISIT_LOCKED), Non réalisée (reason shown), AnnuléeAkram
2DA-10 rules: required photos per visit type (« Terminer » disabled with « 1 photo de façade requise »), photo states queued / sending / sent / failed, required checklist items, a required report routing to DA-12, offline with everything queued and the sync badgeAkram
3DA-11 Visite non réalisée: required reason from VISIT_NOT_DONE_REASON, comment, optional photo, confirmationAkram
4DA-12 Rapport de visite: person met (name, role from PERSON_ROLE), interest Faible / Moyen / Élevé (tone segmented control), products and promotions presented (multi-select chips), issues (VISIT_ISSUE_TAG), comment, attachmentsAkram
5DA-12 next action: NextAction (Relance téléphonique, Nouvelle visite, Envoyer le catalogue, Message WhatsApp, Aucune) with follow-up date required unless Aucune; draft autosaved; confirmation « Relance planifiée le 29 mai »Akram
6DA-13 Prospects: list/map toggle, search, filters (ResellerStatus, potential, commune, follow-up due), distance sort, clusters, « Nouveau revendeur » → DA-14, delegate scope only, offline cache, empty and filtered-emptyAkram
7DA-19 Relances: groups En retard (derived), Aujourd'hui, À venir; TaskType icons; complete; reschedule; open the point-of-sale sheet; empty « Aucune relance »Akram
8Annotate every report field with its reference list and every offline action with its outbox behaviour (client-generated UUIDv7, occurredAt)Akram
9Link the visit prototype DA-08 → DA-10 → DA-12 (and the DA-11 branch)Akram
10Feasibility: offline outbox for visits and reports, photo queue and compression, timer accuracy in backgroundImad

Deliverables

  • Claude Design › Delegate App › DA · Visit (DA-10…12, DA-19) and DA · Prospects (DA-13) with every VisitStatus state
  • Linked visit prototype DA-08 → DA-10 → DA-12 with the not-done branch
  • Field → reference-list annotation table for DA-11 and DA-12

Acceptance criteria

  • Each VisitStatus has exactly one primary action, and finished visits are read-only
  • The finish action is primary (not red) and is disabled with an explicit reason when required photos or items are missing
  • Every report field names its reference list (PERSON_ROLE, VISIT_ISSUE_TAG, VISIT_NOT_DONE_REASON), and next action + date rules are shown
  • Every frame has an offline variant or note, and nothing in the visit flow requires the network
  • DA-13 shows only the delegate's scope (ACL-03)
  • Imad's review answer is OK or OK with notes

Requirements covered

RequirementTitleRelease
FLD-08Visit and check-in: time and position at check-in, duration, checklist, note, photos (mandatory by visit type), call; finished visit lockedV1
FLD-09A visit not carried out requires a reasonV1
FLD-10Structured visit report (person met, interest, products and promotions presented, issues, next action, follow-up date, attachments) that triggers the follow-upV1
CRM-08Follow-ups (relances), tasks and next actions with due dates and notificationsV1

Screens

ScreenNameApp
DA-10Visit & check-inDA
DA-11Visit not done — reasonDA
DA-12Visit reportDA
DA-13Prospects & resellers (list / map)DA
DA-19Follow-ups & tasksDA

Test measures

  • Visit prototype walkthrough with Imad, then timed: a full visit with report in under 3 minutes of taps
  • 200 % text scale on DA-10 (visit must hold at 200 %)
  • Check DA-12 against cahier §6.8 field by field

Risks

  • The report is too long to fill at the counter — chips and defaults first, free text last; only person met, interest and next action are required.

KPI

  • Delivered by Wed 4 Nov 2026 within 1 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.