DES-23 — Smart notifications design — Notification Centre, action buttons, promotion tabs, flash-sale countdown

Designs the additions of HOCO's document 03: the home Notification Centre with its six groups, the action button on notification rows, the grouped inbox, group preferences, the Promotions / Ventes flash tabs and the flash-sale countdown card, on the reseller app and the reseller web.

FieldDetails
Task codeDES-23
PhaseP1 — V1 build & integration
Product scopeV1
StatusPlanned
StartWed 18 Nov 2026
DueThu 19 Nov 2026
ResponsibleAkram — UI/UX designer
Co-responsible—
Effort1 person-day(s) planned · 3 from scratch · size S
Area · appReseller app design · design
Depends onDES-22
UnblocksWEB-06, MRA-11
Milestones—

Summary

Designs the additions of HOCO's document 03: the home Notification Centre with its six groups, the action button on notification rows, the grouped inbox, group preferences, the Promotions / Ventes flash tabs and the flash-sale countdown card, on the reseller app and the reseller web.

Description

HOCO's document 03 (18 Oct 2026, change request) arrived after the reseller-app design days, so its V1 surfaces are designed as a P1 addition right after the client feedback round (DES-22), before Imad builds them in MRA-11 and Anis in WEB-06. Inputs: /docs/srs/smart-notifications (groups, actions, anti-fatigue rules, French copy), PRM-07, NOT-09/10/17 and the existing RA-09, RA-24, RA-26 and RA-35 frames. Components first, then the screen states. Out of scope: V2 loyalty surfaces (missions, Top 3, Offres exclusives), which go into DES-30.

Subtasks

#SubtaskOwner
1Components: NotificationGroupChip (six tones of NotificationGroup, unread count, selected/disabled), NotificationRow with an action button (primary small, secondary), FlashSaleCard with Countdown (under 24 h: hh:mm:ss; from 24 h: « Se termine dans 2 jours »; ended state)Akram
2RA-09 home: « Centre de notifications » card (chips + 3 latest unread with actions, « Vous êtes à jour » empty state, loading), flash sale in the carousel with « VENTE FLASH »Akram
3RA-26: group tabs « Toutes · Urgent · Promotions · Nouveautés · Suggestions », hidden empty tabs, grouped item (« 3 nouveautés chez HOCO »), row with action button, read/unreadAkram
4RA-24: tabs « Promotions » / « Ventes flash », flash list sorted by end, ended card, tab hidden when emptyAkram
5RA-35: per-group push switches with Urgent locked and its explanationAkram
6Reseller web: RW-02 Notification Centre card, RW-11 dropdown and page with the group column, RW-10 tabs and flash gridAkram
7Same-day feasibility check of the Android push action button and the per-second countdownImad

Deliverables

  • Claude Design › Reseller App › RA · Notification Centre, RA · Promotions · flash and the matching Reseller Web frames
  • Updated components in the design system (NotificationGroupChip, NotificationRow with action, FlashSaleCard)
  • Handoff notes for MRA-11 and WEB-06

Acceptance criteria

  • Every V1 group, the action button, the flash-sale card and the tabs have frames for loading, content, empty and error
  • No stock quantity and no loyalty element appear in the V1 frames
  • Countdown and action button meet 48 dp targets and 4.5:1 contrast
  • The six group tones are distinguishable without colour (icon + label)

Requirements covered

RequirementTitleRelease
NOT-09Notification groups and the Notification Centre on the reseller home (Urgent, Promotions, Nouveautés, Points et niveaux, Academy, Suggestions)V1
NOT-10An action button (label and deep link) on every reseller notificationV1
NOT-17Anti-fatigue rules: promotional push caps, priority, merge, quiet hours, opt-out per groupV1
PRM-07Flash sales (2 h to 48 h) with countdown and the promotion tabs Promotions / Flash SalesV1

Screens

ScreenNameApp
RA-09HomeRA
RA-24Promotions & daily offersRA
RA-26NotificationsRA
RA-35SettingsRA
RW-02HomeRW
RW-10Promotions & daily offersRW
RW-11NotificationsRW
RW-12Profile, store, addresses & settingsRW

Test measures

  • Walk the smart-notification catalogue and check that each V1 deep link has a target frame
  • Design QA checklist on the new components (detached instances, raw values)

Risks

  • HOCO asks to see missions or the Top 3 — show the release placement on /docs/srs/smart-notifications; log them for DES-30

KPI

  • Delivered by Thu 19 Nov 2026 within 1 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.