HOCO B2B
Team tasksAkram

DES-30 — V2 designs — loyalty, packs, returns, credit, analytics

Design the V2 surfaces during the build phase: loyalty and rewards, packs, detailed credit, advanced analytics.

FieldDetails
Task codeDES-30
PhaseP1 — V1 build & integration
Product scopeV2
StatusPlanned
StartThu 26 Nov 2026
DueSun 6 Dec 2026
ResponsibleAkram — UI/UX designer
Co-responsible—
Effort6 person-day(s) planned · 8 from scratch · size L
Area · appV2 design · design
Depends onDES-22
UnblocksMRA-20
Milestones—

Summary

Design the V2 surfaces during the build phase: loyalty and rewards, packs, detailed credit, advanced analytics.

Description

Akram designs the V2 surfaces during the V1 build phase, so V2 development can start right after the three months without a design gap. In scope: profitable packs (RA-37, BO-52), loyalty points, levels and history (RA-38, BO-53), rewards and redemption (RA-39, BO-54), the web equivalent (RW-15), detailed credit with overdue tracking and reminders (BO-47) and accounting exports (BO-48), plus a proposal for advanced analytics (ANA-06), which has no screen yet. Returns and after-sales are not here: they became V1 on 17 Oct and were designed in DES-09, DES-10, DES-18 and DES-20. Inputs: LOY-01…05, PRM-06, FIN-06/07/09, ANA-06, the loyalty parts of reference reseller-01 and reseller-06 that were postponed in the Day-1 audit, and the V1 design system (tokens v1.1). Consumers: Imad's MRA-20 (which depends on this task) and Anis's DSH-20, DSH-21 and WEB-20. V2 design must never leak into the V1 builds.

Subtasks

#SubtaskOwner
1Loyalty components and tokens (minor version bump): level badges Bronze, Silver, Gold, VIP, points pill, progress to the next level, LoyaltyTransactionType rows (Gain, Bonus, Échange, Expiration, Ajustement, Annulation)Akram
2RA-38 Fidélité: points balance, level and progress over the period, points history, expiry notice; V2 variants of the RA-09 home (Points tile and loyalty card restored) and RA-27 accountAkram
3RA-39 Récompenses: catalogue by RewardType (Bon d'achat, Livraison gratuite, Remise, Cadeau, Priorité nouveautés), redemption confirmation, vouchers and their use at checkout (RA-18 V2 variant)Akram
4RA-37 Packs rentables: list and detail (pack price vs sum of items, stock), add the pack to the cart as a unit (cart line V2 variant), interaction with promotionsAkram
5Back-office: BO-52 packs editor, BO-53 loyalty settings and level thresholds (client-validated), BO-54 rewards and redemptions queueAkram
6Finance V2: BO-47 overdue board with payment terms, due dates, reminders history and the blocking / approval policy; BO-48 accounting export formats and historyAkram
7RW-15 Fidélité, récompenses et packs at 1440 and 768Akram
8ANA-06 proposal: cohort, reseller activity scoring and delegate benchmarking views; add the new rows to the screen inventory via a change requestAkram
9V2 client review session and revisionsAkram
10Feasibility review of the mobile V2 frames against the V2 contract (SRV-29)Imad
11Feasibility review of the back-office and web V2 framesAnis

Deliverables

  • Claude Design › Reseller App / Back-office / Reseller Web sections V2: RA-37…39, BO-47, BO-48, BO-52…54, RW-15 with their states
  • Loyalty and pack components added to the libraries (tokens minor release with changelog)
  • ANA-06 analytics proposal and the matching inventory change request
  • V2 client review notes

Acceptance criteria

  • Every V2 screen in screens.json assigned to DES-30 exists with default, empty, loading and error states
  • V2 frames live in clearly marked V2 sections and never replace V1 frames
  • Level thresholds, point rules and credit policy are shown as settings, not hard-coded
  • HOCO has reviewed the V2 designs
  • Imad and Anis have done their feasibility reviews

Requirements covered

RequirementTitleRelease
LOY-03Levels Bronze, Silver, Gold, VIP over a period with client-validated thresholdsV2
LOY-04Rewards catalogue (voucher, free delivery, discount, gift, early access) and redemptionV2
PRM-06Profitable packs: bundles of references at a pack price, added to cart as a unitV2
FIN-06Detailed credit: payment terms, due dates, automatic blocking or approval when exceededV2
ANA-06Advanced analytics (cohorts, forecasting, delegate benchmarking)V2

Screens

ScreenNameApp
RA-37Packs list & detailRA
RA-38Loyalty: points, level, historyRA
RA-39Rewards & redemptionRA
BO-47Overdue & remindersBO
BO-48Accounting exportsBO
BO-52PacksBO
BO-53Loyalty settings & levelsBO
BO-54Rewards & redemptionsBO
RW-15Loyalty, rewards & packsRW

Test measures

  • Prototype walkthrough: earn points on a delivered order → redeem a voucher at checkout
  • Check the frames against LOY-01…05, PRM-06 and FIN-06/07/09 requirement by requirement
  • Design QA checklist on the V2 sections

Risks

  • V2 work competes with design QA of the V1 builds (DQA-02…05) — V1 QA always takes priority; DES-30 fills the gaps between builds.
  • HOCO has not validated level thresholds or credit rules — design with configurable values and Decision pending stickers.

KPI

  • Delivered by Sun 6 Dec 2026 within 6 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.

On this page