HOCO B2B
Team tasksAkram

DQA-04 — Design QA — back-office

Review of the back-office on desktop, tablet and large screens.

FieldDetails
Task codeDQA-04
PhaseP1 — V1 build & integration
Product scopeV1
StatusPlanned
StartWed 16 Dec 2026
DueWed 16 Dec 2026
ResponsibleAkram — UI/UX designer
Co-responsible—
Effort1 person-day(s) planned · 1.5 from scratch · size S
Area · appDesign QA · design
Depends onDSH-12
UnblocksQA-03
Milestones—

Summary

Review of the back-office on desktop, tablet and large screens.

Description

Akram reviews the back-office build against the Claude Design handoff once the administration pages are done (after DSH-12), at desktop, tablet and large-screen widths (NFR-05). Inputs: the staging dashboard, the BO frames and page specs of design v1.1, the five page templates, the permissions matrix and one staging account per role. Scope: visual fidelity, template consistency, states (loading, empty, filtered-empty, error, live rows), role-based navigation and keyboard accessibility; functional defects are filed for QA-03. Issues go to Anis in AnisBetehi/hoco. This review unblocks Akram's functional test campaign QA-03, which depends on it.

Subtasks

#SubtaskOwner
1Review every V1 BO page at 1440 and 1920, then the shell and key pages at 1280 (rail) and 1024 / 768 (drawer)Akram
2Template consistency: page headers, filter bars with URL sync and saved views, table density, pinned first column, pagination, empty and filtered-empty copy, form sticky action bar and leave guardAkram
3Role walkthrough with one staging account per role (super admin, commercial admin, stock, finance, delivery, direction): menu items present or absent per permission, never greyedAkram
4Key flows visually: BO-41 orders-to-confirm queue with live new rows and control icons, BO-39 allowed actions, BO-42 kanban drag states, BO-13 validation with customer type, BO-28 three-price and attribute tabs, BO-69 returns and claims, BO-70 support regionsAkram
5Status pills and charts: tones from enums.json, KPI deltas with arrows and signs, chart table views, the « Temps réel interrompu » indicatorAkram
6Keyboard and focus: tab order, visible focus ring, modals trapping focus, Ctrl K palette, Esc closing drawersAkram
7File issues with a screenshot, Claude Design link, viewport and severity, labelled design-qaAkram
8Triage and fix planAnis

Deliverables

  • Design QA issues in AnisBetehi/hoco labelled design-qa, with viewport and severity
  • Back-office design QA report: pages reviewed per width, role-navigation results, accepted deviations

Acceptance criteria

  • Every V1 BO page has been reviewed at 1440, and the shell and list templates at 1280 and tablet width
  • Each of the 6 staff roles sees exactly the navigation its permissions allow
  • No page scrolls horizontally at 1280; tables scroll inside their card
  • No blocker or major issue remains without an agreed fix

Requirements covered

RequirementTitleRelease
NFR-05Back-office usable on desktop, tablet and large screensV1
NFR-07Accessibility: readable contrast, reachable buttons, consistent text sizes, explicit messagesV1

Test measures

  • Side-by-side screenshot comparison with the frames and page specs
  • Keyboard-only pass on the orders-to-confirm queue and a form page
  • Re-test of the fixes on staging

Risks

  • Template pages were built from specs, not mocks, so expectations differ — judge them against the template and spec, and log disagreements as design decisions rather than defects.

KPI

  • Delivered by Wed 16 Dec 2026 within 1 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.

Generated from content/plan/tasks.json by scripts/generate-team-tasks.mjs. Dates are computed by the scheduler (Sunday–Thursday weeks, holidays excluded) — change the plan, not this page.

On this page