MDA-20 — V2 — Optimised routes & field analytics in the delegate app

Show optimised routes with time windows and richer performance analytics.

FieldDetails
Task codeMDA-20
PhaseP4 — V2 evolutions
Product scopeV2
StatusPlanned
StartThu 28 Jan 2027
DueSun 31 Jan 2027
ResponsibleImad — Mobile developer (Flutter)
Co-responsible—
Effort1.5 person-day(s) planned · 3 from scratch · size S
Area · appDelegate app · mobile
Depends onMRA-20
UnblocksDQA-12
MilestonesV2 delivered

Summary

Show optimised routes with time windows and richer performance analytics.

Description

V2 brings automatic tour optimisation and richer field analytics to the delegate app (FLD-18, ANA-06). Scope: show the optimised visit order with ETAs and time windows in the tour programme and on the map (server-computed, e.g. an encoded polyline and per-stop ETA), mark the order as « Ordre optimisé », optionally request re-optimisation from the current position when the policy allows, and extend DA-21 performance with trends, team/zone benchmarks and the prospect-to-first-order funnel. Routing is computed by the server (SRV-37); the app only displays it and keeps it in the offline snapshot. It needs the V2 extensions of delegate-tours and delegate-day (SRV-29/SRV-37/SRV-38) and Akram's DES-30 designs; it ships behind feature flags.

Subtasks

#SubtaskOwner
1Snapshot schema update (drift migration) for optimised order, per-stop ETA, time windows and encoded route polylineImad
2Tour programme and mini-map rendering the optimised order with time windows and « En avance » / « En retard » against ETAImad
3Map polyline decoding and display of the optimised route, with offline fallback to the stored polylineImad
4« Réoptimiser depuis ma position » action when the policy allows, online only, with the result replacing the order after confirmationImad
5Performance analytics in DA-21: trends over weeks, benchmark vs zone/team average, conversion funnel prospect → install → account → first orderImad
6Feature flags and graceful degradation when the server has no optimisation for a tourImad

Deliverables

  • apps/delegate/lib/src/features/tour/ optimised-order rendering
  • apps/delegate/lib/src/features/reports/ analytics widgets
  • Drift migration with tests

Acceptance criteria

  • An optimised tour shows the same order in list and map with ETAs and time windows (FLD-06, FLD-18)
  • The optimised order is available offline after the morning snapshot
  • Re-optimisation is impossible offline and never silently changes an imposed order
  • Analytics figures match the back-office for the same delegate and period (ANA-06)

Requirements covered

RequirementTitleRelease
FLD-18Automatic tour optimisation (routing engine)V2
ANA-06Advanced analytics (cohorts, forecasting, delegate benchmarking)V2

API surface

Test measures

  • Drift migration test from the V1 schema
  • Widget tests of ETA/time-window states
  • Integration test against the V2 mock for an optimised tour

Risks

  • Optimised ETAs that are unrealistic in Algerian traffic undermine trust — show time windows rather than exact minutes and collect feedback from delegates

KPI

  • Delivered by Sun 31 Jan 2027 within 1.5 person-day(s).
  • Every acceptance criterion above demonstrated before hand-off; linked requirements' acceptance criteria pass.
  • Zero open critical defects, permission gaps or data-integrity regressions at sign-off.